Legacy Peak K-5 Elementary School

Colorado Springs, Colorado

A large open collaborative learning space with an American flag, whiteboard walls, and a curved gray and cream upholstered work pod, where a student in a pink hoodie works on a laptop inside it while others study at tables and lounge seating throughout the room.
An exterior view of a tan brick school building with a blue and green angled metal canopy over the entrance and "Legacy Peak Elementary, An Academy District 20 School" signage, where American and Colorado flags fly and families walk toward the entrance and a playground visible in the distance.
A school library and classroom area with a green accent wall, a whiteboard reading "Genre: Historical Fiction," and students reading, browsing bookshelves, and working at tables and standing desks throughout the open space.
A school hallway with a wood-slat ceiling feature and a green accent wall alcove labeled with wayfinding signage for "The Office," "The Open Table," and "The Grove," where a teacher writes on a whiteboard for children seated at a round table while others walk past in the corridor.
A wide exterior view of a two-tone brick middle or high school building with a blue canopy entrance, set against snow-capped mountains in the background, with cars passing on the street in the foreground.

Legacy Peak Elementary educates, empowers and engages students via project-based learning, an authentic approach that captures the heart and passions of students and teaches them how to use that knowledge in real-life situations.  Today’s communities need schools that build the capacity of  students to think outside the box, collaborate, communicate, lead and engage – in the classroom and in life.

The Academy 20 school district established these educational goals and mission for this new school as well as made a promise to their voters that it would be designed, constructed and opened within a 16-month schedule.  HCM teamed with Nunn Construction under a design-build contract to accomplish this task.  The design process and schedule was broken into three distinct paths, the civil and entitlement work, structure, and the building and landscaping.  Bid and construction packages were issued and managed as a team, allowing construction to begin within 5 months of the project kickoff.

The 93,000 sf, two-story school consisted of three distinct programs, which included a 60,000 sf K-5 elementary school, the 22,625 square foot center for modern learning, and the 10,500 sf Challenger Program.  Each of these three distinct programs have their own entry, but are part of a single building and have the opportunity to share resources like the gymnasium and outdoor playgrounds.