Projects

Calvert School Field House and Squash Facility

Baltimore, Maryland

Exterior view of the fitness room's glass corner at dusk, illuminated cardio equipment visible through the windows beneath a sloped roof overhang.
Covered exterior walkway with a brick facade and a glass-walled corridor showing a bright yellow accent wall inside, visible at dusk.
Angled exterior view of the athletic building's entrance, with dark metal paneling above a brick base and glass entry doors.
Two-story squash court with students playing below while three others watch from the upper-level railing, and spectators seated on wood bleachers visible through the glass back wall.
Corridor outside the squash courts with built-in wood benches, a student sitting on a bench using his phone in front of a diagonal-striped team-color mural, two men talking near the glass court walls.
Exterior of the gymnasium wing with dark metal paneling and a football goal post in front, brick base and clerestory windows along the roofline.
Weight and fitness room with strength training machines, free weights, and medicine balls, a student lifting a barbell near floor-to-ceiling windows overlooking the parking lot.
Covered exterior walkway at dusk with a brick facade and a glass-walled corridor showing a bright yellow accent wall inside.
Wood tiered bleachers where students sit and watch squash matches through a glass wall, a weight room with cardio and strength equipment visible through glass doors to the right.
Exterior brick entrance with a wide staircase and cable railing, students sitting and talking on the lower steps near a covered glass entryway.

The Calvert School continues to explore ways to enhance and fully support their mission. Acknowledging the continued interest in wellness and fitness and responding to a growing demand for squash facilities, the school once again is partnering with HCM to design their new 29,000 SF Athletic Center. This new $8.5M facility includes 10 singles squash courts, a new indoor turf field along with a fitness room along with support facilities.

HCM was first engaged to assist Calvert in reimagining the facility. An earlier design proved to be too costly, allowing Calvert the opportunity to re-think the project and how it sits on their campus. HCM worked with Calvert to find the optimal location for the new center, while also repositioning an adjacent athletic field into some recently acquired property.

HCM then worked closely with Calvert and Mullan Construction, the Construction Manager, to refine the facility design to work within Calvert’s budget and schedule needs. This modified integrated project delivery process resulted in a design approach that will meet Calvert’s needs while responding to a range of factors.

The facility’s design draws inspiration for the existing context found on Calvert’s campus, while also creating an expressive appearance consistent with the building’s purpose. The facility is open for the Fall 2022 school year.