Projects

The Bryn Mawr School Innovation Lab Renovation

Baltimore, Maryland

An open work area with a vaulted wood ceiling and lime green trim, where two staff members and several students sit around a table with laptops near a whiteboard, while a student on a gray sofa works alone in the foreground.
A classroom with a vaulted wood ceiling, blue and green accent walls, and a wall covered in colorful sticky notes under "Entertainment" and "Lifestyle" headers, where a teacher gestures while a student presents at a sliding whiteboard and others sit in a small group.
A computer lab with rows of iMacs along both walls beneath sticky-note brainstorming boards, where four students work at a central table with a small robot and laptops.
A double-height makerspace with lime green accent walls, a mezzanine loft, and a pegboard tool wall covered in student ID photos under a banner reading "Meet the Makers," where a woman uses a laser cutter and CNC machine while others work at computers through an interior window.
The same style of vaulted-ceiling work area with a whiteboard reading "Research → Brainstorm → Develop → Prototype → Refine → Build → Have fun!!!!!!," where three men and two women sit in discussion around a table.

The Bryn Mawr School (BMS) believes that the creation of a cross-disciplinary Innovation Lab supports the recognition that students learn as much from hands-on experience and real-world challenges as they do from textbooks or computers. These experiences will help achieve equity and full participation for women in science, mathematics, engineering and technology. HCM helped BMS evolve its previous “all-in-one” space into a “design-build-critique” suite of rooms with full-time dedicated staff. The project required the architects and interior designers at HCM to identify underutilized spaces on the campus, and quickly transform them into a hub of innovation and entrepreneurial study. When thoughtfully planned and placed, transformative renovations can make a profound impact on an institution’s ability to meet the needs of its current students and attract new ones. The project was completed over the course of Summer 2016 and opened in the Fall of 2016.