28th & Blake
Project
Projects
Greeley, Colorado
Greeley West High School was originally constructed in 1965 as an 800-student high school. By 2019, the original building was supported by an array of 19 temporary portable classrooms. The campus capacity was 1,058, and enrollment was severely exceeding this capacity (2018 – 1,603 students, 120 staff). A successful 2019 Bond election funded the complete on-site replacement of the high school.
A new replacement facility, with capacity for 1,800 students, was constructed on the existing campus. The design-build team created a school that includes modern learning spaces, a central hub space for dining and social functions, state-of-the-art facilities for career and technical courses, and enhanced safety and security throughout the campus. During construction, GWHS was an active community occupied by students.
A major design challenge was finding the correct positioning of the building on site. A desire to have the building as the heart of the campus required the plan to slip in between the existing, operational high school building and the newly completed high school football field and stadium. Much of the open space on the original campus was in a flood plain and was not available for the new building footprint.
The curving, radial floor plan allowed the program to fit within the site constraints. The main hall bend reduced the line-of-site in the school for safety purposes and allowed for an experience of periodic discovery.
The “Hub”, a reincarnation of the central space from the prior building, was placed at the very heart of the campus. This position was not only necessary to keep the existing school operational; it also resulted in a final layout that separated the public front of the school and its vehicular traffic from the pedestrian-friendly west side, with safe connection from the hub to the athletic fields and campus amenities.
The design includes flexible, industry-inspired CTE spaces at that support programs in construction trades, welding, agriculture, horticulture, business, and family & consumer science. Specialized shops, labs, and classrooms provide adaptable environments that foster real world, hands-on learning while accommodating the evolving needs of career and technical education.
A primary focus for the design team was to maximize occupant well-being so that students and teachers could reach their full potential at GWHS. The following design features and biophilic elements were incorporated to achieve an optimal social and learning environment:
The new site design at Greeley West High school responds directly to the needs of the school’s athletic program while creating spaces for socialization, learning, and daily class activities.
The entire campus vehicular and pedestrian circulation has been transformed to create a more welcoming and functional entrance. This main entrance creates the basis for a prominent east-west pedestrian promenade that connects the community and student drop-off areas. A diversity of outdoor spaces, such as outdoor classrooms, break-out spaces, plazas, open lawn, a multi-functional outdoor amphitheater, and sports facilities (including six tennis courts a baseball and softball field), combine to provide a variety of opportunities for teaching and socializing during, and after school hours.
The graphics at Greeley West were designed to create a high-impact environment that reinforces school pride through the school’s bold colors, identity, and core values. At the same time, we thoughtfully celebrated the diversity of the Greeley West community.
With students representing many countries, inclusivity became a key design principle throughout the school. Multiple languages are incorporated into the graphics to reflect the school’s multicultural community and foster a welcoming, inclusive environment.
Building on an occupied site created one of the biggest challenges, as there was nowhere to take the kids to do a demo and rebuild. The solution was to wedge 270,000 square-foot building into the space between the existing building and the athletic field, and that has resulted in 100% of the project being built with 1,750 kids within an arm’s reach.
Kent Henson, Assistant Superintendent of Support Services for Weld County School District 6